Route 133 Corridor

Link to Story Map

storymap cover

Overview

The Town has an opportunity to enhance the vitality and mobility of the historic Shawsheen Village. The project focuses on Route 133 (Lowell Street) which is a major arterial route running through the heart of a dynamic, growing area of the Merrimack Valley. Not only will this improve mobility along the corridor, it will provide an opportunity to re-imagine Shawsheen Village. There are many natural and historic resources that are unique to Shawsheen and this project aims to uncover and highlight them to revitalize an important area in our community.

Scope

  • The project limits will extend approximately 1.25 miles, from West Parish to Shawsheen Village
  • Include upgrades at the intersections with Beacon Street/Shawsheen Road and Main Street (Route 28)
  • Improve safety and roadway capacity
  • Introduce bicycle accommodations, ADA-accessible sidewalk and crosswalks, and more.

Public Comments on the Draft Development TIP 2024-2028


The Merrimack Valley Metropolitan Planning Organization makes decisions about how Federal transportation funds will be used in the region for planning, construction, transit services and more. With input from community officials, members of the public and transportation advocates, the MVMPO implements the regional transportation planning process for the Merrimack Valley region. Please review the DRAFT Development TIP 2024-2028 and provide comments.


MVMP FY2024-2028 DRAFT



25% Submittal to MassDot - Currently Under Review

RT 133 25 Submittal

November 2021 Project Update

November 2021 Project Update

June 24, 2021 - Public Meeting

Link to Meeting Recording

June24 Meeting image

Link to June 24 Presentation

Header 6.24.21 presy

November 18, 2020 - Public Meeting

Link to November 18 Public Meeting Recording

nov 18 public meeting

Link to November 18 Presentation

presentation cover

Link to Survey Results

Survey Link Header

Please take the Survey!

Design Proposals

October 14, 2020 - Public Meeting

QA Header

Link to AndoverTV to view meeting

october 14 public meeting

Link to presentation

image for presentation

Preliminary Rendering

The images below depict a concept developed by The Engineering Corp. (TEC), the engineering firm hired to assist the Town with this project. We look forward to engaging the public in discussions regarding the opportunities that this project presents and will use this concept as a prompt for our community conversation in the coming months. 

Andover Route 133_Render_Before
Andover Route 133_Render_After
Andover Route 133_Concept 1
Andover Route 133_Concept 2

Route 133 Documents

2013 Vision

What does this mean for Shawsheen?

Click the image below to see vision plans that were compiled when the project was first introduced to the public in 2010.

planview shawsheen

What should we expect?

Click the image below to see a presentation of the project.

Route 133 Map

Contact

Paul Materazzo

Email: Pmaterazzo@andoverma.gov

Phone: 978-623-8655