- Home
- Departments
- Public Works
- Ledge Road Landfill Closure
Ledge Road Landfill Closure
Project Overview
View the most recent presentation: Ledge Road Landfill Closure Presentation (9.13.2023)
Site Description
- Located off Greenwood Road and Chandler Road in the Town of Andover
- A 23-acre former municipal landfill that stopped receiving waste in 1972
- A portion of the former landfill is currently used as a DPW Materials Handling Area
- A portion of the former landfill was used for recreational athletic fields up until 2016
- Landfill-related contamination has been detected in groundwater, surface water, and wetland soil downgradient and west of the landfill. Arsenic concentrations in downgradient wetland soil were observed significantly higher than the MassDEP Imminent Hazard Criteria. Release Tracking number (RTN)3-27632 was assigned to the site.
Overview of Work
Cap and close the ledge Road Landfill, including but not limited to mobilization site preparation, grading, wetland soil remediation (excavation and relocation to landfill), waste consolidation, construction of the landfill capping system including passive landfill gas system and stormwater control systems, wetland replication, clean-up, and demobilization.
Greenwood Road drainage system improvements include the installation of deep sump catch basins, an in-line separator, and a new 18” outfall pipe.
Ledge Road Landfill Closure Documents
- Ledge Road Landfill Closure Presentation -09.12.2023
- Notice of PIP Meeting 9.12.17 (PDF)
- Net Metering and Landfill Solar Analysis - 10-5-15 (PDF)
- Post Closure Uses of the Ledge Road Landfill Site - Continued Discussion - 7-30-15 (PDF)
- Potential Post Closure Uses of the Ledge Road Landfill Site - 6-1-15 (PDF)
- Ledge Road Landfill Closure Status Update - 1-21-15 (PDF)
- Ledge Road Landfill Closure Project Summary - 12-16-14 (PDF)