P&G/Gillette - 30 Burtt Road
Category: Permitted
Plan/File Number: SP24-01 & SP24-02
Applicant: The Gillette Company, LLC
Project Description: 201,684 gross square foot addition for warehouse, manufacturing, laboratory, and office uses, and related parking adjustments.
Minor Modification Request submittal
Applicant submittal
- Application for Special Permit for a Major Non-Residential Project & Special Permit to Reduce the Number of Parking Spaces
- Project Narrative
- Zoning Compliance Memorandum
- Site Plan Set
- Architectural Plans
- ALTA_NSPS Land Title Survey
- List of Deeds
- Certified List of Easements, Restrictions and Encumbrances
- Stormwater Report
- Transportation Impact Assessment
- Planning Board Meeting Presentation 5.28.24
- MassDEP Public Notice 6.5.24
- MassDEP Proposed Air Quality Plan Approval Draft 5.24.24
- Applicant Memorandum to the Planning Board 6.18.24
- Memorandum from the Water Superintendent 6.21.24
- Planning Board Meeting Presentation 6.25.24
- GPI Traffic Peer Review Letter #1 6.25.24
- Horsley Witten Group Initial Stormwater Peer Review 6.27.24
- Applicant Request to Continue Public Hearing without Discussion 7.15.24
- Applicant Response to Initial Stormwater Peer Review 7.30.24
- Revised Stormwater Report 7.30.24
- Revised Civil Permit Drawing Sheets 7.30.24
- Letter from Andover Green Advisory Board to the Department of Public Health 7.31.24
- Vanasse & Associates Response to GPI Traffic Peer Review 7.31.24
- Landscaping Plan Slides 8.7.24
- Horsley Witten Group Second Stormwater Peer Review 8.8.24
- Planning Board Meeting Presentation 8.13.24
- Revised Parking Summary 8.14.24
- Response to Horsley Witten Group Stormwater Peer Review 8.27.24
- Revised Long Term Pollution Prevention Plan and Stormwater Operation & Maintenance Plan 8.27.24
- Revised Civil Plans 8.27.24
- Existing Conditions Photo Attachment 8.28.24
- Outlet Protection Sizing Calculations 8.28.24
- Horsley Witten Group Third Stormwater Peer Review 8.30.24
- Applicant Memorandum to the Planning Board RE: Traffic Expenditures 9.3.24
- Response to Horsley Witten Group Third Stormwater Peer Review 9.5.24
- Revised Civil Plans 9.5.24
- Letter from the Sierra Club to the Planning Board 9.10.24
- GPI Traffic Peer Review Letter #2 9.10.24
- MassDEP Final Air Quality Plan Approval 9.12.24
- MassDEP Response to Comments 9.12.24
- Revised Stormwater Report 9.13.24
- Final Site Plan Set 9.14.24
- Vanasse & Associates Response to GPI Traffic Peer Review #2 9.17.24
- Applicant Response to Tewksbury Resident Concerns 9.17.24
- GPI Traffic Peer Review Letter #3 9.24.24
- Planning Board Meeting Presentation 9.24.24
- MassDOT Consent to the Issuance of a Building Permit 9.27.24
- Letter from Skanska USA Building Inc. RE: Parking Garage Construction Phasing 9.30.24
- Memorandum from Department of Public Health RE: PFAS 10.2.24
- DPW Traffic Mitigation 10.8.24
- GPI Signal Cost Estimate 10.8.24
- Applicant Letter RE: Tewksbury Residents 10.8.24
- Memorandum from GreenbergTraurig to the Conservation Commission RE: Notice of Intent 10.9.24
- Memorandum from the Fire Department RE: Storage of Hazardous Materials 10.11.24
- Applicant Request to Continue the Public Hearing without Discussion 10.21.24
- Town Counsel Planning Board Presentation RE: Home Rule Local Regulatory Authority 10.29.24